Flooring it

Posted on September 11, 2013 at 4:15 AM

5th-11th September 2013

We've spent the last few days and will be spending the remainder of the week constructing the floor, which consists of 3 sections of 18mm OSB raised on 44x69mm beams. The sections are designed to slot together and are held in place by tensioning bars running the entire length of the sim. These bars are then earthed to the rest of the simulator.

This photo shows the middle section (known as the Flight section - the bit which will hold the faux cockpit) under construction, with the shorter Avionics Section at the top end for alignment. This should be complete by the end of Wednesday and the remaining Cabin section started and finished on Thursday & Friday


Categories: Sim Construction