4th-8th November 13

The Final parts of the outer construction at this stage have been completed, with the holes cut in the rear wall left for the window frame and the kickout panel (escape route), and the rear wall right for the window . All of these had baton frames around them but the windows will be mounted into a slot in section at a later date, as will the panel be.

This leaves us some nice holes to let the light in while we do the interior, which we've started on the 7th with the first chair and the 8th with the hardboard for the floors. We've also cut the door, though this also will not be mounted until a much later date.

Pictured, the Rear Left Wall with Window Frame (top) and Kickout Panel Frame (bottom)